baner2
  • Bulgarian
  • English
You are visiting:Home arrow News arrow Biogas increasing installation


Biogas increasing installation Print E-mail

From the end of March 2014 DRES represents Weber Entec, Germany, and offers for the Balkans up to 25% biogas production increasing.

The process: BioPush ultrasonic reactor, develops homogenous cavitation field through powerful plane transducers.

This gives:

  • better substrate degradation
  • better stirring
  • increases diffusion
  • increases the substarte surface
  • durable decreases of viscosity
  • accelerate degradation
  • heightened gas yield
  • increases enzyme activity
  • accelerates hydrolyses
  • improves substrate degradation

With pay-back term of less than 1 year we offer more biogas with less cost. Can be integrated on every moment of building or exploiting the biogas plant. No maintenance, no consumables. We need only your substrate data as type and quantity to present the right offer.

Всичко това обуславя увеличаване на биогаза до 25%. Като се има предвид, че почти всички биогаз инсталации ползват силажи и скъпо струващи енергийни добавки, срокът на изплащане на инсталацията е около и по-малък от 1 година!

Нашето предложение: Повече биогаз за мо-малко средства! Може да се изгради на всеки етап от изграждането или експлоатацията на биогаз инсталациите. Няма сервиз и обслужване.

Моля, свържете се с нас за да ни дадете описание на суровините (вид и количество). Ние ще изготвим Вашия проект.

 
Next >

Created by: violleta.com